We join before the walls close.
The earlier we’re in the drawings, the more the house can do and the less of it has to be opened up later. Most of our work happens before anything is visible.
How it works, start to finish
Routes to → Opportunity · project_category: new_build · status: new_lead
Who should be at the first meeting?
Ideally you. Builders often prefer to hold the relationship, and we understand why. They’re coordinating everyone. But most of what we ask about is preference, not construction. Preference is hard to carry second-hand.
What tends to happen otherwise is that the decisions get made, the house gets finished, and the questions arrive after you move in. Why this went there. Why that wasn’t possible. They’re nearly always answerable. They’re just cheaper to answer before the walls close. Your builder is welcome in the room either way.
Have we left it too late?
Before the pour, conduit can go into the slab, so anything outside has a clean path to it. Before framing, joists get placed around speakers, light housings and shade pockets rather than in front of them. Each stage that passes narrows the options a little.
The technology decision almost always comes late. That’s normal. Nobody is thinking about keypads while they’re choosing a roof. If the insulation isn’t in yet, we can nearly always make it work.